Jawahar Tunnel is two tunnels with the length of first tunnel approximately 2.85 km &length of second tunnel is 2.50 Kms. The Tunnel is in operation from 22 December 1956. It is situated between Banihal and Qazigund area.
Jawahar Tunnel is two tunnels with the length of first tunnel approximately 2.85 km &length of second tunnel is 2.50 Kms. The Tunnel is in operation from 22 December 1956. It is situated between Banihal and Qazigund area.